Rayo Vallecano will renovate its stadium with 4,000 more seats and a VIP area by 2029. The Community of Madrid is seeking private companies to assume the cost of the 60 million euro renovation.

What changes will be made?

The Rayo Vallecano stadium will return to its origins and overcome the deficits that prevented it from meeting the standards to compete in the Spanish league or European competitions.

The project aims to remedy the lack of space for the fans, with 4,000 extra seats. The stadium will increase from 14,500 to 18,500 spectators.

What is the timeline for the project?

The timeline for the project is estimated to be 24 months. However, the renovation is designed to allow the stadium work to coexist with the development of competitions.

StatisticValue
League8th with 50 points, 12 wins, 14 draws and 12 losses in 38 games
Last resultCrystal Palace 1-0 Rayo Vallecano (2026-05-27)

What new features will be incorporated?

Another novelty will be the VIP space for the fans, connected by a walkway to a new multi-purpose building. The goal is to configure a complex that can host other sports and social initiatives when matches are not being played.

The design will give the future Rayo stadium a unique character, combining modern aesthetics with the original. The 'skeleton' of the 1950s will be visible, with a facade featuring a lightweight, translucent and permeable double skin.